Horizontal concrete pump is a kind of construction machinery and equipment designed for concrete pouring, mainly used for conveying concrete to the pouring point through pipeline, which is suitable for small and medium-sized construction projects and construction scenarios that are not suitable for the use of tower cranes.
Horizontal concrete pump operation method
Preparation
1. Check whether the power connection of the equipment is normal.
2. Confirm whether the pipeline connection is firm without leakage.
3. Ensure that there is no foreign matter blocking the pump and the hydraulic oil is sufficient.
Second, start the equipment
1. Turn on the main power, start the control panel.
2. Check the readings of each meter to ensure that the equipment is running normally.
Three, conveying operation
1. Adjust the conveying pressure and flow, adjust the parameters according to the construction requirements.
2. Feed the concrete evenly to avoid over-drying or over-thinning.
Fourth, stopping operation
1. After finishing conveying, clean up the residual concrete in the pump.
2. Close all valves and power supply, and record the operation data.
Maintenance of horizontal concrete pump
Daily maintenance
1. Clean the pump body and pipeline after daily use to prevent concrete residue from solidifying.
2. Check whether the hydraulic system is leaking oil, replenish or replace the hydraulic oil in time.
Second, regular maintenance
1. Check whether the filter element needs to be replaced every 100 hours of operation.
2. Lubricate the bearings and key parts every 500 hours of operation.
Seasonal maintenance
1. Use antifreeze in winter to prevent the hydraulic system from being affected by low temperature.
2. Pay attention to heat dissipation in summer and keep good ventilation.