Case

Case

Home > Case

In 2013, Xi’an Rail Transit Project required a large amount of concrete for station and tunnel construction.

2024-08-26

In 2013, Xi’an Rail Transit Project required a large amount of concrete for station and tunnel construction. Due to the small space on site, it was impossible to arrange a traditional concrete mixing station, so a self-loading concrete mixer truck was used to supply concrete.

Equipment selection: The 8-cubic-meter self-loading concrete mixer truck produced by Manxing Company was selected. This model has the characteristics of self-contained hopper and fast unloading, which is very suitable for rail transit construction sites with limited space.

Construction process:

The concrete mixer truck takes materials from the nearest mixing station and mixes while driving.

After arriving at the construction site, the concrete is directly loaded from the self-contained hopper to the pump truck or transport truck.

Flexible scheduling, arrange the feeding frequency of the mixer truck according to the construction rhythm.

Safety control:

Develop a detailed vehicle dynamic monitoring and scheduling plan to ensure the continuity and timeliness of concrete supply. Strengthen on-site command and dispatch and personnel training to ensure safe and orderly operation. Develop an emergency plan to enable rapid response when vehicle failure or other emergencies occur.

Project effect: In the narrow construction site, the self-loading concrete mixer truck played an important role and met the supply demand of a large amount of concrete. Through scientific scheduling and safety control, the construction site operation order was good and no casualties occurred. The overall progress of the project was in line with expectations, providing strong support for the construction of urban rail transit

Home Tel Mail Inquiry